HKUST(GZ)
EN
ZH
Home
About Us
Mission and Vision
Brief Introduction
All Staff
Design and Fit-out
Repair and Maintenance
Operations and Maintenance Overview
Centralized System
Air Conditioning and Ventilation System
Electrical System
Laboratory Equipment and Facilities
Work Order System
Test Report
Sustainable Related
Links
Design and Construction Standards
Label Identification
Home
About Us
Mission and Vision
Brief Introduction
All Staff
Design and Fit-out
Repair and Maintenance
Operations and Maintenance Overview
Centralized System
Air Conditioning and Ventilation System
Electrical System
Laboratory Equipment and Facilities
Work Order System
Test Report
Sustainable Related
Links
Design and Construction Standards
Label Identification
Label Identification
Home
>
Links
>
Label Identification
Home
About Us
Mission and Vision
Brief Introduction
All Staff
Design and Fit-out
Repair and Maintenance
Operations and Maintenance Overview
Centralized System
Air Conditioning and Ventilation System
Electrical System
Laboratory Equipment and Facilities
Work Order System
Test Report
Sustainable Related
Links
Design and Construction Standards
Label Identification
All
Equipment identification
Exhaust
Fire Fighting
Gas
HVAC
Panel identification
Room identification
Safety identification
Strong and Weak electricity
Valve identification
Water supply and drainage
Pure water return pipe
Drain pipe
Drain pipe
Experimental water
Pure water
Drain pipe
Experimental water supply pipe
Experimental water supply pipe
Life water supply pipe
Life water supply pipe
Pure water pipe
Pure water pipe
Compressed air(CA)
Carbon dioxide (CO2)
Carbon dioxide (CO2)
Nitrogen(N2)
Nitrogen(N2)
Compressed Air Cork
Central gas supply pipe
Life water supply main valve
1
2
3
4