The Laboratory Service Department's daily maintenance and upkeep work includes:
- Assisting the laboratory in carrying out daily maintenance work, such as temperature and humidity control, electrical problem troubleshooting, etc., providing technical support for the stable operation of the laboratory;
- Responsible for the operation and maintenance of the central computer room and systems, such as the central air compressor room, pure water room, nitrogen room, sewage treatment room, exhaust gas treatment system, etc.;
- Operation and maintenance of laboratory-related air conditioning and ventilation systems, such as AHU air conditioners, constant temperature and humidity air conditioners, cleanroom air conditioners, fresh air conditioners, rotary dehumidifiers, fan coil units, central equipment cooling water systems, independent cold and heat sources, EV emergency exhaust systems, etc.;
- Assisting with preventive maintenance of equipment and facilities in the laboratory area, such as emergency sprinkler and eyewash stations, etc.
- Assist with the operation, maintenance, testing and technical support of the laboratory's local electrical system, including preventive inspection of laboratory distribution boxes, electrical testing upon laboratory completion, and technical support for instrument and equipment power connection;
- Provide work order repair services for the laboratory: users can schedule repairs through the work order system for minor repair issues and testing needs that occur during laboratory operation;
- Inquiry of relevant test reports: such as pure water terminal test reports, nitrogen terminal test reports, compressed air terminal test reports, and wastewater treatment system water quality test reports;
- Exploration of sustainability: such as sustainable labeling, green laboratory certification, and central system usage metering analysis;
The proposed maintenance plan for equipment and facilities in the school's laboratories in 2026 is shown in the table below:
| 2026年实验室设备设施运维计划方案 | ||||||||||||||||
| 序号 | 实验室英文名称 | 实验室中文名称 | 楼栋 | 楼层 | 配电箱点检 (周期/半年/不停电) | 空调运维 (周期/季度) | CO2灭火器点检 (周期/月度) | 喷淋洗眼装置点检 (周期/双周) | 气体灭火装置点检 (周期/月度) | EV紧急排风系统检测 (周期/年度) | 通风柜检测 (周期/年度) | 风机盘管清洗 (周期/年) | ||||
| 上半年 | 下半年 | 第1季度 | 第2季度 | 第3季度 | 第4季度 | 运维时间计划 | 运维时间计划 | 运维时间计划 | 运维时间计划 | 运维时间计划 | 运维时间计划 | |||||
| 1 | Bio-inspired Engineering Research Facility | 生物启发工程中央实验室 | W1 | L1 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | 每月上旬/下旬两次 | / | / | / | 1、12月 |
| 2 | Intelligent Autonomous Driving Center (IADC) | 智能自动驾驶技术中心 | W1 | L1 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 |
| 3 | Teaching & Learning | 红鸟实验室-红鸟学创大教室 | W1 | L4~L6 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 |
| 4 | Teaching & Learning | 红鸟实验室-精密实验室 | W2 | L1 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 |
| 5 | Materials Characterization and Preparation Facility(GZ) (MCPF(GZ)) | 材料表征与制备中央实验室 | W2 | L1 W1~W2/L1 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | 每月下旬 | / | 7、8月 | 1、12月 |
| 6 | Teaching & Learning | 红鸟-本科实验室二期 | W2 | L2 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | 7、8月 | 1、12月 |
| 7 | Advanced Additive Manufacturing Lab (AAM Lab) | 先进增材制造实验室 | W2 | L3 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | 每月上旬/下旬两次 | / | 11月 | 7、8月 | 1、12月 |
| 8 | Institute of Integrative Service Robots (IISR) | 集成服务机器人实验室 | W2 | L3 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | 每月下旬 | / | / | 1、12月 |
| 9 | Lab of Future and Technology(LFT) | 香港科技大学(广州)-诸暨联合创新中心 | W2 | L4 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 |
| 10 | Atmospheric Environmental Risk Characterization and Management Lab(Air Lab) | 大气环境风险表征与管理实验室 | W2 | L4 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | 每月上旬/下旬两次 | / | 11月 | 7、8月 | 1、12月 |
| 11 | INTR/ SMMG/ ROAS Interim Dry Lab Space | 临时干式实验室 | W2 | L5 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 |
| 12 | Lab of Future and Technology(LFT) | 未来技术实验室 | W2 | L6 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | 11月 | 7、8月 | 1、12月 |
| 13 | Brilliant Energy Science and Technology (BEST Lab) | 超级能源科技主题实验室 | W2 | L6 | 已完成 | 7.20~7.24 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | 每月上旬/下旬两次 | 每月下旬 | 11月 | 7、8月 | 1、12月 |
| 14 | Teaching & Learning | 红鸟实验室-材料制备实验室 | W3 | L1 | 1.19~1.23 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | 每月上旬/下旬两次 | / | / | / | 1、12月 |
| 15 | Materials, Design and Manufacturing Facility(GZ) (MDMF(GZ) ) | 材料、设计和制造中央实验室 | W3 | L1 W3-W4/L1 | 1.19~1.23 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 |
| 16 | Advanced Hybrid Manufacturing Lab (HM Lab) | 先进复合制造实验室 | W3&W4/ highbay | L1+L2 | 1.19~1.23 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 |
| 17 | Seamless Connectivity and Connected Intelligence Center(SC2I) | 全域互连与网联智能研究中心 | 1.19~1.23 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 | ||
| 18 | The Institute for Cross-sea Engineering and Integrated Transportation | 综合立体交通数字孪生与仿真实验室 | 1.19~1.23 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | / | 1、12月 | ||
| 19 | Multi-functional Polymeric Membranes Research Facility | 多功能高聚物薄膜中央实验室 | W3 | W3-W4/L1 L3 | 1.19~1.23 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | / | 7、8月 | 1、12月 |
| 20 | Wave Functional Metamaterials Research Center | 波功能超材料中央实验室 | W3 | W3-W4/L1 L3 | 1.19~1.23 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | 10月 | 7、8月 | 1、12月 |
| 21 | Green e Material Laboratory(GeM) | 绿色e材料实验室 | W3 | L4 | 1.26~1.30 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | 10月 | 7、8月 | 1、12月 |
| 22 | Center for Heterogeneous Integration of Microsystems and Packaging(CHIP) | 微系统异构集成与封装中心 | W3 | L4 | 1.26~1.30 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | 每月上旬/下旬两次 | / | 10月 | 7、8月 | 1、12月 |
| 23 | Novel IC Exploration Facility, NICE | 芯片中央实验室 | W3 | L5 | 1.26~1.30 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | / | 10月 | 7、8月 | 1、12月 |
| 24 | Brilliant Energy Science and Technology (BEST Lab) | 超级能源科技主题实验室 | W3 | L6 | 1.26~1.30 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | 每月上旬/下旬两次 | / | 11月 | 7、8月 | 1、12月 |
| 25 | Quantum Science and Technology Center(QSTC) | 量子科技中心 | W3 | L6 | 1.26~1.30 | 7.26~7.30 | 1月 | 4月 | 8月 | 12月 | 每月上旬 | / | 每月下旬 | / | / | 1、12月 |
| 26 | AI+ Lab | 人工智能前沿交叉科学实验室 | E1 | L3 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | / | 1、12月 |
| 27 | Center for Digital World with Intelligent Things(DOIT) | 数字世界研究中心 | E1 | L4 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | 每月下旬 | / | / | 1、12月 |
| 28 | Big Data Institute(Guangzhou)(BDI) | 大数据研究所(广州) | E1 | L5 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | 每月下旬 | / | / | 1、12月 |
| 29 | Teaching & Learning | 红鸟实验室-大型机械加工实验室 | E2 | L1 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | / | 1、12月 |
| 30 | Computational Media Art Laboratory(CMAstage0) | 计算媒体与艺术实验室 | E2 | L3 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | 每月下旬 | / | / | 1、12月 |
| 31 | Industrial Intelligence and Data Analytics Lab(IIDA Lab) | 工业智能与大数据分析实验室 | E2 | L5 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | / | 1、12月 |
| 32 | Industrial Informatics and Intelligence Institute(Triple i Institute) | 工业信息与智能研究院 | E2 | L5 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | / | 1、12月 |
| 33 | Guangdong Provincial Key Laboratory of Integrated Communication, Sensing and Computation for Ubiquitous Internet of Things(ICAC-IoT) | 广东省通感算交叉融合泛在物联网重点实验室 | E2 | L6 | 已完成 | 6.29~7.03 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | 每月下旬 | / | / | 1、12月 |
| 34 | Teaching & Learning | 红鸟实验室-木工实验室 | E3 | L1 | 已完成 | 7.06~7.10 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | / | 1、12月 |
| 35 | Earth and Environmental System Research Facility, EESRF | 地球和环境系统中央实验室 | E3 | L1 | 已完成 | 7.06~7.10 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | 每月下旬 | 10月 | 7、8月 | 1、12月 |
| 36 | Indoor Environment and Energy Laboratory,(IEEL) | 室内环境及能源实验室 | E3 | L1 | 已完成 | 7.06~7.10 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | 7、8月 | 1、12月 |
| 37 | Lab of Future and Technology(LFT) | 专精特新工程材料研究中心(FYTRI实验室迁移) | E3 | 1L | 已完成 | 7.06~7.10 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | / | 1、12月 |
| 38 | Teaching & Learning | 红鸟-本科实验室 | E3 | L2 | 已完成 | 7.06~7.10 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | 每月上旬/下旬两次 | / | 10月 | 7、8月 | 1、12月 |
| 39 | Bioresearch Lab(Bio Lab)BSBE | 生物研究实验室 | E3 | L3 | 已完成 | 7.06~7.10 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | 每月上旬/下旬两次 | 每月下旬 | 10月 | 7、8月 | 1、12月 |
| 40 | Bioresearch Lab(Bio Lab)BSBE二期 | 生物研究实验室(二期) | E3 | L4 | 已完成 | 7.06~7.10 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | 每月上旬/下旬两次 | / | 10月 | 7、8月 | 1、12月 |
| 41 | HSE lab safety suport facilities | HSE安全服务实验室 | E3 | L4 | 已完成 | 7.06~7.10 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | 每月上旬/下旬两次 | / | / | 7、8月 | 1、12月 |
| 42 | Biosciences Central Research Facility(GZ) (Bio-CRF(GZ)) | 生物科学中央实验室 | E4 | L1 E4-E3/L1 | 已完成 | 7.13~7.17 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | 9月 | 7、8月 | 1、12月 |
| 43 | Transportation Behavioral &Safety Lab(TBPS Lab) | 交通行为心理及安全实验室 | E4 | L1 | 已完成 | 7.13~7.17 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | / | 1、12月 |
| 44 | BIRI 二期(含BioCRF 二期) | 脑与认知实验室、脑与智能研究所(二期) | E4 | L2 | 已完成 | 7.13~7.17 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | 9月 | 7、8月 | 1、12月 |
| 45 | Brain & Intelligence Research Institute Stage 1&stage2(BIRI) | 脑与智能研究所 | E4 | L3 | 已完成 | 7.13~7.17 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | 每月上旬/下旬两次 | / | 9月 | 7、8月 | 1、12月 |
| 46 | LSD Workshop | LSD工坊 | NE3 | L1 | 1月26号~30号 | 7.13~7.17 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | / | 1、12月 |
| 47 | Atmospheric Environment Observation Station, (AEOS) | 大气环境综合观测研究站 | NE3 | L3 | 1月26号~30号 | 7.13~7.17 | 1月 | 4月 | 8月 | 12月 | 每月下旬 | / | / | / | 7、8月 | 1、12月 |